| Baltimore-Washington Maglev
Project
"Stand Alone" Executive Summary
The "Stand Alone" Executive Summary
for the Baltimore-Washington Maglev Project generally repeats
the content of the executive summary found in Volume I of
the DEIS with the primary difference being the inclusion of
larger scale mapping. It is designed for those interested
in gaining a quick understanding of the entire project along
with easy- to-read alternative mapping, without having to
download Volumes I and II. It presents the following sections:
Introduction, Purpose and Need Overview, Technology Overview,
Alternatives Assessment Summary, Environmental Impacts and
Mitigation Summary, Public Involvement Summary, and, Next
Steps. Alternative C (Amtrak Parallel Alternative) was retained
for detailed study as the Build Alternative because it is
the most feasible and constructible and satisfies the project
purpose and need. The No-Build Alternative was also retained
for detailed study.
|