environmental impact statement
DEIS Document

Baltimore-Washington Maglev Project
"Stand Alone" Executive Summary

The "Stand Alone" Executive Summary for the Baltimore-Washington Maglev Project generally repeats the content of the executive summary found in Volume I of the DEIS with the primary difference being the inclusion of larger scale mapping. It is designed for those interested in gaining a quick understanding of the entire project along with easy- to-read alternative mapping, without having to download Volumes I and II. It presents the following sections: Introduction, Purpose and Need Overview, Technology Overview, Alternatives Assessment Summary, Environmental Impacts and Mitigation Summary, Public Involvement Summary, and, Next Steps. Alternative C (Amtrak Parallel Alternative) was retained for detailed study as the Build Alternative because it is the most feasible and constructible and satisfies the project purpose and need. The No-Build Alternative was also retained for detailed study.

 
 
Executive Summary
  Cover pdf icon 261 KB
  Title Page pdf icon 282 KB
  Summary pdf icon 1.45 MB
Figures    
  ES 1 pdf icon .99 MB
  ES 2 Index pdf icon 1.23 MB
  ES 2 Plate 1 pdf icon 520 KB
  ES 2 Plate 2 pdf icon 708 KB
  ES 2 Plate 3 pdf icon 594 KB
  ES 2 Plate 4 pdf icon 336 KB
  ES 2 Plate 5 pdf icon 594 KB
  ES 2 Plate 6 pdf icon 633 KB
  ES 2 Plate 7 pdf icon 706 KB
  ES 3 pdf icon 191 KB
  ES 4 pdf icon 395 KB
  ES 5 pdf icon 1.5 MB
  ES 6 pdf icon 481 KB
  ES 7 pdf icon 1.25 MB
  ES 8 pdf icon 175 KB
  ES 9 pdf icon 137 KB
  ES 10 pdf icon 62 KB
  ES 11 pdf icon 47 KB
       
       
  return to top